Manufacturing, delivery, installation, and after-sales service terms
1. The equipment is assembled in the factory as a whole, and the delivery time is 7-10 working days from the date of receiving the advance payment.
2. Our company is responsible for transporting to your company, and the transportation cost will be borne by our company.
3. The buyer has prepared the necessary auxiliary spare parts for the machine and debugging in advance.
A)、2.5 2 Line 220V power to machine
B) The gas source requirement is above 5kg/cm, and the outer diameter of the intake pipe is 8
4. After the equipment arrives at the buyer's factory, our company will send engineers to install it on-site and provide training on operation, maintenance, and training
5. After assembly and debugging by the seller, preliminary adhesive testing has been conducted to confirm whether it meets production requirements.
6. Acceptance: Conduct inspection and acceptance at the buyer's factory in accordance with the contract.
7. Warranty: Within one year of delivery, if there are design, manufacturing, or manufacturing company responsibility issues, free repairs and necessary parts replacement should be carried out in a timely manner. If the operating procedures are violated and the machine malfunctions, the maintenance cost shall be borne by the buyer. After receiving the customer's repair notification, respond within 24 hours and troubleshoot within 48 hours. (Except for imported spare parts that have exceeded the delivery period)